새집을 짓는 절차와 소요 기간은 ?
Conceptual plan
Budgeting ( gathering the estimate and shape decision )
hiring Architect
Making a Plan
Submit
Appointment of Examiner
Solving Objection
Getting Approval of the Plan
Hiring GC
General Contractor
Sometimes Developer / GC is hiring a Architect and its Service
Getting Work Permit
Sub contractor hiring by GC
Electric
Plumbing
HVAC and Mechanical
Others
Excavation -- Leveling
Footing
Foundation wall
and Water proofing
Water main job
French drain / Drain piping / water line set up
Framing
Fire proofing
Other structure / including Steel Structure or Wood Joist
Inspection
Electric wiring
Main panel / Sub Panel / Bathroom, Kitchen wiring
inspection
Lighting fixture installation
Piping by Plumber
With Water Main construction with Permit
Rough Inspection
Wall close
Fixture installation
Exterior job ( Wall and Roofing )
Windows
Doors
Flooring
Wall finish
with Sheetrock and finish
Bathroom finish
Kitchen finish
Tiling
Kitchen cabinet
Plb, elect, oither installation
Appliance Installation
Gate
Landscaping
Outside street and Tree planting
( side walk concrete )
all
CO inspection
TR1 report
TCO application
CO application
Getting C of O
finalize with final matewrial
Completion letter
Conceptual plan
Budgeting ( gathering the estimate and shape decision )
hiring Architect
Making a Plan
Submit
Appointment of Examiner
Solving Objection
Getting Approval of the Plan
Hiring GC
General Contractor
Sometimes Developer / GC is hiring a Architect and its Service
Getting Work Permit
Sub contractor hiring by GC
Electric
Plumbing
HVAC and Mechanical
Others
Excavation -- Leveling
Footing
Foundation wall
and Water proofing
Water main job
French drain / Drain piping / water line set up
Framing
Fire proofing
Other structure / including Steel Structure or Wood Joist
Inspection
Electric wiring
Main panel / Sub Panel / Bathroom, Kitchen wiring
inspection
Lighting fixture installation
Piping by Plumber
With Water Main construction with Permit
Rough Inspection
Wall close
Fixture installation
Exterior job ( Wall and Roofing )
Windows
Doors
Flooring
Wall finish
with Sheetrock and finish
Bathroom finish
Kitchen finish
Tiling
Kitchen cabinet
Plb, elect, oither installation
Appliance Installation
Gate
Landscaping
Outside street and Tree planting
( side walk concrete )
Inspection
all
CO inspection
TR1 report
TCO application
CO application
Getting C of O
finalize with final matewrial
Completion letter